
EV charging for your property. We own it and run it.
PulsePoint installs, operates, and maintains Level 2 and DC fast charging stations at Florida properties. For sites that qualify, we can fund the equipment and installation. Every property starts with a site evaluation.
We can fund it for qualifying sites
Condo boards and owners worry about up-front cost, liability, and a charger that breaks and stays broken. After a site evaluation, qualifying properties can have PulsePoint fund the project, and we take operations off your plate.
- Charging hardware, mounting, bollards, and barriers
- Engineering, design, and permit drawings
- Make-ready work and utility coordination fees
- Construction and installation

We run it for the life of the agreement
PulsePoint owns the equipment, so we carry the cost of keeping it working. You get an amenity residents and guests use, plus a share of revenue.
- Network software, updates, and payment processing
- Routine and preventive maintenance
- Repairs and replacement of failed parts
- 24/7 driver support through the network app

From site walk to first charge
Four steps, with the terms in writing before anything is installed.
Site evaluation
Tell us about your property. We review parking layout, electrical service, and driver demand.
Agreement
We put the terms in writing: what we install, where, the revenue share, and who handles what.
Installation
We fund engineering, permits, utility work, and installation, then test and activate the network.
Operation
We monitor, maintain, and support the chargers. Your residents and guests charge with an app.
Charge with an app
Find a PulsePoint station, plug in, and start your session in the app. You see the price before you start, and help is available 24/7.
How to chargePulsePoint sites
Public stations show live availability and directions in the charging app.
301 Madeira Avenue
Level 2 ports, installed
Opens with the building
Boca Raton, FLPorta Bella
Level 2 ports across 3 buildings
Resident access
Winter Garden, FLVintage Horizon West
Level 2 ports, up to 19 kW
Public charging
Kissimmee, FLMagic Village Resort
Level 2 ports, up to 19 kW
Public chargingRequest a site assessment
Tell us about your property. We will review it and follow up.
- Phone888-610-0601
- Email[email protected]